Mounties RSL Club

Construction of a Future Tunnel for Mount Pritchard RSL Club by MPA Construction and Fitout. Stage 1 scope of 40x contiguous piles to 4m deep, working in confined space, with a restricted head height of 4.1m and a width span of 3.6m. Piling Experts modified an auger to drill 350 dia piles, utilised an exhaust hose to eliminate fumes in the confined space, carried out excavation, hammering of unexpected obstructions. Total of 7 working days to excavate basement, hammer exisiting footings and drill 40x piles in a contiguous sequence.

Client: 
Cockram
Location: 
Mountain View CA 94043
Geotechnical Engineer: 
Lorem ipsum dolor sit amet
Structural Engineer: 
Lorem ipsum dolor sit amet
Value: 
$200.00
Duration: 
Friday, June 23, 2017

Project Description

Construction of a Future Tunnel for Mount Pritchard RSL Club by MPA Construction and Fitout. Stage 1 scope of 40x contiguous piles to 4m deep, working in confined space, with a restricted head height of 4.1m and a width span of 3.6m. Piling Experts modified an auger to drill 350 dia piles, utilised an exhaust hose to eliminate fumes in the confined space, carried out excavation, hammering of unexpected obstructions. Total of 7 working days to excavate basement, hammer exisiting footings and drill 40x piles in a contiguous sequence.