Mascot - Existing Warehouse Development
Apr 25,2016
44x screw piles installed at depth 6-9m deep
Location:
Mascot
Geotechnical Engineer:
JK Geotechnics
Structural Engineer:
ZAIT Engineering
Value:
$45,000
Duration:
3 days
Project Description
A Project for Proton group in an existing lot to extend the current warehouse. Originally designed as a concrete bored pile structure, but with Piling Experts alternate proposal, Client was able to save up to 40% in Budget, time and traffic on site. A Total of 44x screw piles installed at depth 6-9m deep